|
Do not use
|
My contract was signed 2/13/19. I was called the same day as installation 4/25/19. No advance notice. Cobwebs left after job done. Dripping occurred due to extra flashing installed that was not ordered or on original gutters When I complained I was told it was normal and afterwords was ignored. Very difficult to contact after instllation.
|
|
|
|
|
|
|